Interior renovation work continues for woodland project

interior-renovation-work-finish-tiling-and-installation-of-bathroom-wares1

interior-renovation-work-finish-tiling-and-installation-of-bathroom-wares-4

interior-renovation-work-finish-tiling-and-installation-of-bathroom-wares-3

design, , , plumber work

All the tiling works for living, kitchen and 02 bathroom had finish and as you can see its still very dirty and messy. i’m still pressing for time to finish on 25 Feb. During the removal of existing false ceiling and cornice  from the previous owner, cost a lots of debris and holes on the ceiling and the wall during the removal. At the mean time,  the plumber workers  were  arranged to come in to lay the stainless steel piping for kitchen and  both bathroom not forgetting the bathroom ware . i also manage to arrange for the city gas contractor to lay the gas piping to the stove area on the same day. The reason is that  i need not be at the job site to wait for the gas contractor. It’s just wasting time……….:)

What is next?

Post to Twitter Post to Delicious Post to Digg Post to Facebook Post to Google Buzz Post to StumbleUpon Post to Technorati


Related posts:

  1. Renovation work continues at Woodland Flat
  2. Woodland flat renovation works continues on the debris clearing and uploading of materials
  3. First day of the renovation work
  4. The first renovation work after Chinese New Year
  5. Do you need to apply HDB permit for carpentry work in HDB house?

Speak Your Mind

*

Spam Protection by WP-SpamFree