Renovation work installation of solid surface top

renovation installing solid surface (1)

Renovation work : installing solid surface top onto a kitchen cabinet I wanted to give you an idea how solid surface top for kitchen cabinet are being install. Many people though solid  surface is prepare at the factory and just deliver and put on the kitchen cabinet. It take about 5 to 7 days  working… [Continue Reading]

The construction team and interior design

construction-team

I was at my site yesterday and it was super damn hot in the afternoon and my shirt was wet after the 2 hours under the sun. Anyway  can you tell which one is me? Silly me of cos you can…. They are the most hard working workers i ever see. I do not see… [Continue Reading]

Getting ideas for floor tiles pattern

design-floor-tile02

I’ve been busy looking for new ideas for laying of outdoor tiles pattern. today i happen to be at a food court and i saw something interesting which caught my attention. The design of it make up of forming  pebble and copper bar forming the outline  shape of the flower paddle. It definitely will help… [Continue Reading]

My friend the tiler and me

tiler and tiling work  (18)

This is a picture of my tiler friend (Mr foo) and me taken at the job site he working on. I told him that i wanted to take some pictures he actually hand on and this for my blog. He got a group of workers working under him and most of the time i only… [Continue Reading]

Renovation work lady tiler on the job

hello As an interior designer and a site coordinator for so many years hardly seen a lady tiler in this trade. I was surprise to see a lady tiler at my job site. This trade is dominate by the male species ………….. I have a chat with her and i found out she has been… [Continue Reading]

Renovation work – Taking the challenge laying of wall tile

reno work tile0002

Hey , Wow…! Surprise….  I’m actually trying to lay wall tiles for the first time. i wanted to has a feel of the job since sometime back and finally got the chance to try it. Here are some take by my worker when i trying it out. It not too difficult nor it is an… [Continue Reading]

Renovation work Outdoor coy pond water feature design

riverina renovation coy pond makeover

Many weeks had past and very soon the  coy pond water feature will be finish. The whole reconstruction of the coy pond is done by this gentleman.  He had been working on the coy  pond water feature  for the pass few weeks. And Wow la…………….This is the final product of his work. This afternoon I… [Continue Reading]

Renovation @ riverina Scaffolding getting ready for painting

renovation work scaffolding  (8)

I have been very busy on Riverina Project and here are some takes on the project during scaffolding construction. It was interesting to stay and watch the scaffolding workers at work and most of the workers are almost 50 or above 50 years old. and how graceful they move from pole to pole assembling all… [Continue Reading]

Carpentry works for Fairmount Condominium

Carpentry work wall feature design01

Those are pictures are taken just after the carpenters had finish the installation of the wall feature with tv console and shoe cabinet. you may remember i post the 3D perspective designs a week ago. i might have change the colour and the design a bit after discussing with the client. After the carpentry work,… [Continue Reading]

Landscaping outdoor wall feature with coy pond

renovation work outdoor water feature

I have been very busy with few of my  renovation site  for this past  week. Here are some images taken at riverina  job site when  the workers removing the stones from the surrounding  of the pond. The coy fishes were removed before hand in the morning. The pictures were taken in the afternoon when I’m… [Continue Reading]